• ArcGIS Web Application

    Your browser is currently not supported. Please note that creating presentations is not supported in Internet Explorer versions 6, 7. We recommend upgrading to the

    Get Price
  • Gas-insulated switchgear (GIS) - Hitachi ABB Power Grids

    Gas-insulated high-voltage switchgear (GIS) is a compact metal encapsulated switchgear consisting of high-voltage components such as circuit-breakers and disconnectors, which can be safely operated in confined spaces

    Get Price
  • HV SUBSTATION PROJECT - Matelec group

    HV SUBSTATION PROJECT BRIEF HISTORY Et bihl d i 1987 f th il ti f l HV MV d Established in 1987 for the realization of complex HV, MV and LV projects. The Division starts with 5 engineers in the Construction of the Congress Palace 60/20kV S/S in Syria and the Rehabilitation of Jamhour Bsalim 150kV S/S in Lebanon.

    Get Price
  • Gas-Insulated Substations : GE Grid Solutions

    Grid Solutions HV/MV Equipment Gas-Insulated Solutions Gas-Insulated Solutions GE designs, manufactures, installs and services a full range of state-of-the-art Gas-Insulated Substations (GIS) for utilities and industries worldwide.

    Get Price
  • Yahia Bouchene - Foreman, Electrical - Qatargas | LinkedIn

    LV/MV/HV switchgears, GIS and substations. LV/MV motors, MCCs and power transformers. Battery chargers and UPS system. LV/MV VFDs. Protection relays, IEDs and power management system. Power generation and distribution system. Testing and measurement equipment, devices, standards and procedures. النشاط

    Get Price
  • MV/LV Solution - HYUNDAI ELECTRIC

    Low-voltage motor Switchgear Hyundai Electric manufactures high-performance, high-reliability based on IEC and ANSI certified switchgear and has the largest supply record in the domestic industrial plant market, ranging from various types of buildings to plants, including nuclear power plants.

    Get Price
  • Voltage Detectors - LV MV HV Joints Gland Cleats Terminations

    Voltage detectors are used to check for the absence or presence of voltage on medium and high switchgear, transformers or overhead lines – electrical safety is imperative in all areas of power transmission and distribution at all voltage levels including MV, HV and EHV up to 400kV.

    Get Price
  • Hybrid switchgear - Hitachi ABB Power Grids

    PASS (Plug and Switch System) encloses all functions of a complete switchgear bay in a single module. The hybrid design makes use of traditional air-insulated busbars to connect with other equipment in the substation while enclosing the following bay functions in a single-phase gas-insulated housing.

    Get Price
  • Method Statement For Switchgear Installation Of MV LV HV

    1.0 PURPOSE. The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for medium voltage switchgear panel installation its accessories through the guidelines contained herein so as to ensure that the job execution complies with specification and serves the intended function to satisfactory level.

    Get Price
  • Inspection and Test Plan for Switchgear

    Where busbar chambers are oil or compound filled, check welding of tank joints leakage. Checking current transforms and voltage transformers for records of Vendor`s individual tests, correct phasing and polarity, correct ration and VA on CT labels and voltage transformers correctly connected, fuses of links are fitted, and phases are correct.

    Get Price
  • Texas Power Tech

    Completed more than 25 noof Primary Substations. with a range of 400/220kV/132kV/66kV/33kV Gas insulated SS which includes installation of Major Electrical Equipment’s up to 800MVA MVA transformers, 220/132 KV GIS, 33 11 kV Switch gears, LVMV panels, HV cables laying (13266, 11 kV) and terminations, Power control cables, Cable tray Erection, Lighting, lightning protection other

    Get Price
  • Design Installation of EHV/EHV EHV/HV Substations

    EHV: Extra High Voltage (V ≥ 170 kV). HV: High Voltage (72,5 ≤ V ≤ 123 kV). The referred values of V are the highest voltage for equipments, according to IEC Standard 60038– IEC standard voltages. MV: Medium Voltage (3,6 kV ≤ V ≤ 52 kV). LV: Low Voltage (V ≤ 1 kV AC).

    Get Price
  • Switchgear Testing and Commissioning Procedure – Electrical

    High Voltage Testing Procedure. High voltage test is done by applying 80% of factory-tested voltage. While doing the HV test the steps to be followed are as below: Short all CTs circuits. Isolate all VTs. All the CBs are made into service. For doing ‘R’ phase the other phases are shorted and earthed. Before HV IR test 5kV megger is to be done.

    Get Price
  • TAMCO Switchgear Malaysia | TAMCO Switchgear

    Tamco Switchgear Malaysia offers electrical distribution and control solutions in the medium and low voltage range to industries and utilities in South-East Asia, Middle East, Africa, Australia, UK etc. Tamco is a multi-ethnic organization that strives for business excellence and customer satisfaction through its indigenous technology and focus

    Get Price
  • National Grid UK Electricity Transmission plc

    HV Equipment • The relevant HV Equipment shall then be selected to local control at either the substation control point or the local control point by the Authorised Person • LV and mechanical safety precautions shall then be established as per the requirements of the Safety Rules

    Get Price
  • The basics of Gas Insulated Substation (GIS) for students | EEP

    Nov 22, 2018 · To set up GIS inside indoor or outdoor substation safety regulations are further described in IEC 61936-1. Installation regulations are presented to integrate factory assembled and type-tested GIS equipment. Demands of grounding, accessibility, fire protection, safety of walkways and other areas are described.

    Get Price
  • Construction - Special Technical Services L.L.C

    We have over 1,200 items of equipment, in over 80 categories,with complete mobilisation across project sites to ensure timely completion. Oilfield construction is our core capability and we boast of a successful history in executing both Fixed Term EPC Projects and Long Term Service Contracts.

    Get Price
  • Testing and Commissioning Requirements for Switchgear

    High Voltage Test for Switchgear. High voltage test is done by applying 80% of factory-tested voltage. While doing the HV test the steps to be followed are: All CTs circuits are shorted. All VTs must be isolated. All the CBs are made into service. For doing ‘R’ phase the other phases are shorted and earthed. Before HV test 5kVmegger is to be done.

    Get Price
  • Switchgear - Wikipedia

    Today, oil-filled equipment has largely been replaced by air-blast, vacuum, or SF 6 equipment, allowing large currents and power levels to be safely controlled by automatic equipment. High-voltage switchgear was invented at the end of the 19th century for operating motors and other electric machines. [1]

    Get Price
  • Market Trends - Power Line Magazine

    Jun 30, 2018 · The switchgear segment accounts for over 19 per cent weightage (LV 14 per cent, MV and HV 5 per cent) in the overall electrical equipment industry in the country. The growth index of the LV, MV and HV switchgear segments stood at 4.5 per cent, 3 per cent and 15.7 per cent respectively for the April 2017-January 2018 period.

    Get Price
  • alfanar testing and commissioning

    alfanar Testing Commissioning have the most modern test equipment and machinery to carry out the electrical equipment tests at site for HV and LV transmission lines. Oil filtration treatment ATC’s specific choice and blend of materials and products ensure the best performance of our equipment in the oil treatment and puri cation field.

    Get Price
  • High-voltage product services | Product support for power

    High-voltage equipment and other energy infrastructure typically last well beyond its warranty period. More than 2,000 Siemens employees around the world are ready to support your equipment throughout its entire useful life, ensuring best performance, highest availability and efficiency for your machines and systems as well as a secure and stable power supply for decades.

    Get Price
  • MV HV Cable Termination to Equipment Joints - ELECTRICAL

    Terminations to indoor switchgears, electric motors, power transformers, instrument transformers and other electrical MV and HV (MV: Medium Voltage; 1 kV < V < 60 kV. HV: High Voltage: V ≥ 60 kV) equipment issues arising for multiple terminations design, namely for switchgears, and a straight coordination with manufacturer is required.

    Get Price
  • CST Engineering Pte Ltd - cstacc.com

    CST ENGINEERING PTE LTD was established in 1984. The Company provides a wide range of services on electrical installations for both the private and public sectors. The Company is managed by a Professional Engineer with more than forty (40) years experience in the design, installation, testing, commissioning, operation and maintenance of HV/LV switchgear equipment. The technical team is lead by

    Get Price
  • TEXAS POWERTECH WLL | LinkedIn

    TEXAS POWERTECH WLL - DOHA - QATAR About us, We Texas Powertech WLL was established in 2008 by Group of technocrats with an Objective to Provide Professional Quality services to our clients in

    Get Price
  • Electrical Switchgear Risk Assessment Study and Hazard

    Low voltage (LV) Switchgear; Medium voltage (MV) Switchgear; High voltage (HV) Switchgear; Risk assessment is the determination of quantitative or qualitative estimate of risk related to a well-defined situation and hazard. If you use switchgear you must assess the risks and manage them to ensure safe operation and minimise the risk of injury.

    Get Price
  • January 2021 | EEP - Electrical Engineering Portal

    Get access to all premium HV/MV/LV technical articles, electrical engineering guides, and papers. Check out each planbenefits and choose the membership plan that works best for you or your organization. You can choose an annually based Plus, Pro, or Enterprise membership plan. SPECIAL OFFER - Get 15% Off on PRO premium plan, use discount

    Get Price
  • Switchgear and Switchboard Inspection and Testing Guide

    FunctionsSafetyPurposeCertificationsGoalsSummaryDiagnosisFeaturesSecurityIssuesScopeResultsPerformancePreventionSubstations and switchgear in an electrical system perform the functions of voltage transformation, system protection, power factor correction metering, and circuit switching. Electrical power aparatus, such as transformers, regulators, air switches, circuit breakers, capacitors, and lightning arresters comprise the components necessary to perform these functions.

    Get Price
  • Maricon Electromechanical Contracting Trading LLC

    High Voltage AC Testing for Power cables up to 520kv. High Voltage AC Testing for Power cables up to 520kv. HVAC ducting supply and installation. Complete substation testing and commissioning. High Voltage AC Testing for Gas Insulated Switchgear (GIS, GIB) up to 520kv. High Voltage DC Testing for Power cables up to 520kv. Partial Discharge Testing

    Get Price
  • 500 KV Auto Transformer with Oil to gaz sf6 Bushing Test - CR4

    Insulation Power Factor tests measure 3 main quantities: Insulation quality HV to ground, HV to LV, and LV to ground. If you ground the HV, you cannot measure the condition of the HV to ground insulation or the HV to LV, since everything is now LV to ground. And the HV to ground and to LV are probably your more critical measurements (at 500kV!).

    Get Price